Construction pit design

In geohydrological sense, the design of a construction pit often begins with restrictions of the surrounding area, or a study of the influence of the surrounding area. In many situations, only a limited influence on the surrounding area is permissible, for example because of the risks of settlements (soil formation), the presence of ground water pollution, limited space et cetera.

The geohydrological advisors of MOS Grondmechanica place themselves in the tension field and have to make a decision which is technically, but also financially feasible, with a minimum amount of risks.